Front extension - walls remodelled.
Front extension - walls remodelled.
Previously, the roof finished about 1.5m from the floor of the first floor, but after the new roof went in, the ceiling timbers were removed and new studwork installed to give a "proper" wall. Also, if necessary, a set of stairs could go up here to a loft room were that ever built.